| BENEFITS OF SHREDDING... |
|
Saving to date: Since January '06
-
35,995,096 gallons of water
-
1,954,020 gallons of oil
-
87,417 trees
-
5,141 homes powered (electricity) for 6 months
-
457,660 cubic ft. of landfill space
|
 |
|
304 S 12th Street
P.O. Box 22066
Waco, Texas 76702-2066
Office: 254-732-6283
Fax: 254-732-6284
MAP IT
|
|
|
Shred/Destruction Process
- Material is moved to the CertiShred tipper to begin the shred process.
- Material is tipped and placed on the metering table.
- Material is sifted, then placed on the conveyor belt which then feeds into the shredder.
- Any contaminants, plastics, trash, heavy metals, etc. are removed to protect both the shredder itself and the integrity of the recycled material.
- Once shred, the material continues onto the conveyor belt to the baler.
- See Baled Process.
|
|
|
| |
|